Nirlat Paint Company Facility Project
As part of this comprehensive project, we executed the design, manufacturing, and installation of 7 storage tanks for "Nirlat" paint company, specifically engineered for storing materials used in paint industry applications.
Project Details - Thermoplastic Tanks for Nirlat:
Tank Configuration:
- 6 Polypropylene (PP) Tanks - Primary storage solutions for chemical compatibility
- 1 Additional HDPE (High-Density Polyethylene) Tank - Specialized material requirements
- Application: Safe storage of paints, solvents, and water/oil-based compounds
Engineering Design Features:
Structural Configuration:
- Cylindrical Design with Concealed Conical Bottom - Positioned within supporting skirt for complete drainage and clean appearance
- Integrated Walkway Bridges - Dedicated access systems between tanks for convenient, safe operation and routine maintenance
- Complete Operational Adaptation - Custom design matching facility operational needs, including connection interfaces, service ports, and precise structural engineering
Technical Specifications:
Material Selection:
- PP Construction: Chemical resistance for paint and solvent storage
- HDPE Construction: Enhanced durability for specific chemical requirements
- Food/Chemical Grade: Compliance with industry storage standards
Design Advantages:
- Complete Drainage System: Concealed conical bottoms ensure zero product residue
- Safety Access: Integrated walkway systems for maintenance and inspection
- Operational Efficiency: Custom interfaces for seamless facility integration
- Clean Aesthetics: Hidden conical design within supporting skirt structure
Installation Features:
Site Integration:
- Precision-engineered for existing facility layout
- Custom connection systems for operational workflow
- Safety-compliant access and maintenance systems
- Complete structural support and anchoring
Operational Benefits:
- Enhanced storage capacity and organization
- Improved safety protocols for chemical handling
- Reduced maintenance requirements
- Optimized material flow and accessibility
Project Execution: The project was completed in full compliance with safety, quality, and engineering design standards, with comprehensive support from the initial design phase through operational commissioning.