Our Leading Projects

Storage Tanks for Paint Industry

Nirlat Paint Company Facility Project

As part of this comprehensive project, we executed the design, manufacturing, and installation of 7 storage tanks for "Nirlat" paint company, specifically engineered for storing materials used in paint industry applications.

Project Details - Thermoplastic Tanks for Nirlat:

Tank Configuration:

  • 6 Polypropylene (PP) Tanks - Primary storage solutions for chemical compatibility
  • 1 Additional HDPE (High-Density Polyethylene) Tank - Specialized material requirements
  • Application: Safe storage of paints, solvents, and water/oil-based compounds

Engineering Design Features:

Structural Configuration:

  • Cylindrical Design with Concealed Conical Bottom - Positioned within supporting skirt for complete drainage and clean appearance
  • Integrated Walkway Bridges - Dedicated access systems between tanks for convenient, safe operation and routine maintenance
  • Complete Operational Adaptation - Custom design matching facility operational needs, including connection interfaces, service ports, and precise structural engineering

Technical Specifications:

Material Selection:

  • PP Construction: Chemical resistance for paint and solvent storage
  • HDPE Construction: Enhanced durability for specific chemical requirements
  • Food/Chemical Grade: Compliance with industry storage standards

Design Advantages:

  • Complete Drainage System: Concealed conical bottoms ensure zero product residue
  • Safety Access: Integrated walkway systems for maintenance and inspection
  • Operational Efficiency: Custom interfaces for seamless facility integration
  • Clean Aesthetics: Hidden conical design within supporting skirt structure

Installation Features:

Site Integration:

  • Precision-engineered for existing facility layout
  • Custom connection systems for operational workflow
  • Safety-compliant access and maintenance systems
  • Complete structural support and anchoring

Operational Benefits:

  • Enhanced storage capacity and organization
  • Improved safety protocols for chemical handling
  • Reduced maintenance requirements
  • Optimized material flow and accessibility

Project Execution: The project was completed in full compliance with safety, quality, and engineering design standards, with comprehensive support from the initial design phase through operational commissioning.

Share the project

1לוגו נירלט 1

“From the initial stages to completion, we received support with deep engineering knowledge and high-level execution.”

Gilad Peretz, Project Manager - Nirlat Paint Company

Project gallery

Interested in receiving a quote or an initial consultation?

Accessibility Toolbar

Plast Hen We use cookies to ensure the website functions properly and improve user experience. You can choose which types of cookies to enable.
Cookie Selection