As part of a comprehensive engineering project for ICL Corporation, we designed and manufactured a 220 cubic meter polypropylene tank, meeting stringent process requirements and unique field specifications.

Project Phases:

Advanced Engineering Design

4-Month Design Phase - Full collaboration with Röchling Germany, ensuring compliance with complex chemical, mechanical, and operational specifications.

Precision Manufacturing Process

5-Month Manufacturing Phase - Utilizing advanced technologies and innovative techniques. To create the cylindrical section in the tank's lower portion, we were required to weld panels with exceptional 120mm thickness - representing a unique technical and operational challenge.

Transport and Site Installation

The tank was transported to site with 12 police escort vehicles due to its oversized dimensions. On-site execution included complete assembly, removal and disposal of a collapsed existing tank, and completion of piping connections, operational fittings, and auxiliary service systems.

Technical Specifications:

Tank Details:

  • Volume: 220 cubic meters
  • Material: Polypropylene (PP)
  • Special Feature: 120mm thick panel welding
  • Design Partner: Röchling Germany collaboration
  • Project Duration: 9 months total (4 months design + 5 months manufacturing)

Engineering Challenges:

Ultra-Heavy Wall Construction:

  • 120mm Panel Welding - Exceptional thickness requiring specialized welding techniques
  • Advanced thermal management during welding process
  • Precision quality control for structural integrity
  • Custom tooling and equipment adaptation

International Collaboration:

  • German Engineering Standards - Röchling partnership ensuring European technical compliance
  • Cross-border design coordination and specification validation
  • Integration of international best practices with local manufacturing expertise

Project Complexity:

Logistics & Installation:

  • Oversized Transport - 12-vehicle police escort for safe delivery
  • Active Site Operations - Installation in a functioning industrial facility
  • Legacy Equipment Removal - Dismantling and disposal of a failed existing tank
  • System Integration - Complete piping, instrumentation, and service connections

Operational Continuity:

  • Minimal production disruption during installation
  • Coordinated scheduling with facility operations
  • Safety protocols for an active industrial environment
  • Quality assurance throughout the installation process

Engineering Excellence: This project was executed with adherence to high standards of safety, quality, and engineering precision, marking another milestone in our capability to integrate smart solutions for advanced process industries.

International Partnership Success: The successful collaboration with Röchling Germany demonstrates our ability to meet European engineering standards while delivering world-class manufacturing and installation services for complex industrial applications.

Share the project

רותם אמפרט נגב

“We worked with plast hen on a sensitive project that included manufacturing and installation of a process tank at an active site – the work was performed professionally, while fully meeting deadlines and the high standards we required.”

Ital Amitay, Project Engineer - ICL

Technical details

Interested in receiving a quote or an initial consultation?

Accessibility Toolbar

Plast Hen We use cookies to ensure the website functions properly and improve user experience. You can choose which types of cookies to enable.
Cookie Selection